| Type | WO | Work Request CP | Building | Room | Scope of Work (truncated) | Requester | Scheduled Start Date | # days | Time of Day | Status |
|---|---|---|---|---|---|---|---|---|---|---|
| Consultant | 16710 | 196273 | UW Tower Building S | 100 | Please test 2 doors for ACM. Contact Peter to arrange site visit to confirm location, 369-6723. pta98 |
Atkinson, Peter | 10/16/2008 | Work In Progress | ||
| Estimate | 15179 | 092527 | HSB-BB-Wing | BB11 HALLWAYS | 32HAZM: PROVIDE ESTIMATE FOR REPLACEMENT OF STAINED, BROKEN AND/OR MISSING CEILING TILES IN BB11 HALLWAYS. WALK THRU WITH H.S. MCCA FOR SCOPE OF WORK AND TO DETERMINE OPTIONS. |
Babinec, Steve | 3/27/2007 | Estimate In Progress | ||
| Abatement | 17616 | 014620 | Guthrie Hall | room 102 | ABATE PIPE INSULATION IN ROOM 102 CUSTODIAL CLOSET | Baxmann, Dale | New | |||
| Abatement | 17577 | 017420 | More Hall | WELDING SHED ON SOUTH SIDE OF BUILDING | DAMAGED CORRUGATED ASBESTOS WALL IN WELDING SHED ON SOUTH SIDE OF BUILDING | Baxmann, Dale | 9/25/2009 | 1 | Day | Scheduled |
| Consultant | 17617 | 014620 | Guthrie Hall | 103, hallway 56, 57 | SURVEY FOR 103 BEHIND THE TOILET, AND HALLWAY 56,57 Let's test the wall behind the toilet and the wall in the hallway by 56 & 57. | Baxmann, Dale | New | |||
| Abatement | 15485 | 110404 | Lander Hall | L-771 | PLEASE ABATE BROKEN WINDOW. APPOX SIZE 14"X24". THANKS, TBIGGS 6-25-07 | Biggs, Timothy | On Hold | |||
| Estimate | 16200 | 161720 | More Hall | 220-226-230-234 | Please estimate the removel of loose window putty in rooms. 220-226-230-234. Thanks, Tim |
Biggs, Timothy | 3/24/2008 | Estimate In Progress | ||
| Consultant | 17571 | 014353 | HSB-J-Wing | see scope | J681H TEST WALL/RUBBER BASE FOR ACM. RR716C TEST FLOORING MATERIAL FOR ACM. CALL ME TO SCHEDULE WALK-THRU. ELIN | Blandon, Elin | 9/24/2009 | Work In Progress | ||
| Consultant | 17134 | 216441 | HSB-BB-Wing | BB-1416 & BB1402 | 3/30/09 Please provide a good faith survey on a 5 day turn around for BB-1416 & BB1402. Please call me, so we canschedule a walk-thru. Elin |
Blandon, Elin | 3/31/2009 | Work In Progress | ||
| Consultant | 16791 | 199143 | Soc Wk/Sp Hrng Sci | 60 | 11/18/08 Please test for ACM and Lead. We will demo section of wall, replace carpet, patching and painting, Install ceiling grid and new ceiling tiles. Install Elec & Enet outlets. Call me at 265-0480 if you need additional information. thanks, Elin |
Blandon, Elin | 11/20/2008 | Work In Progress | ||
| Consultant | 16739 | 115540 | Engineering Annex | Mens RR | 10/28/08 need the walls check for Asbestos and Lead in all the men rest room at the Urinals. We will be drilling hole for the new urinals (RAB) |
Blandon, Elin | 10/30/2008 | Work In Progress | ||
| Consultant | 16601 | 166150 | Art Building | 327 & 329 | 8/21/08 Please test wall & rubber base for ACM & Lead, 3 days turn-around. Call me at 685-1494 if you have any questions and email me report as soon as possible. SCOPE OF WORK: Demo wall between room 327 & 329. Thanks, Elin ___________________________ |
Blandon, Elin | 8/25/2008 | Work In Progress | ||
| Estimate | 14838 | 025341 | Atmos Sci/Geophys | see scope | I DISCUSSED THIS PROJECT WITH SAEID AND HE WILL PROVIDE A NEW ESTIMATE------ ELIN 11/14/06 PLEASE PROVIDE ESTIMATE OPTIONS: 1. PROVIDE ESTIMATE TO ABATE CEILING TILES IN CORRIDORS OF (7) FLOORS. 2. PROVIDE ESTIMATE TO ABATE A 3-4' SECTION OF CEILIN |
Blandon, Elin | 11/15/2006 | Estimate In Progress | ||
| Abatement | 17618 | 018974 | HSB-BB-Wing | BB-12 Women's RR | CLEAN TILES AND SEAL INSIDE OF WOMENS BATHROOM---PLUMBERS NEED TO FIND OUT WHERE THE LEAK IS COMING FROM...IF CEILING TILE IS MOLDY, PLEASE REMOVE, AND COVER WITH PLASTIC 10-6-09 JB | Booth, John | New | |||
| Abatement | 17615 | 018851 | HSB-D-Wing | D255, D2 CLINIC | NEED ABATEMENT ON PIPING..COUPLE OF JOINTS AND LAGGING..SEE JOHN OR GARY SEXTON… | Booth, John | 10/5/2009 | 1 | Night | Scheduled |
| Abatement | 17580 | 017467 | HSB-D-Wing | D-165 | PLEASE REMOVE ASBESTOS FITTINGS MARKED IN CEILING...SEE JOHN BOOTH OR GARY SEXTON FOR MORE DETAIL. 9-24-09 | Booth, John | 9/28/2009 | 1 | Night | Scheduled |
| Abatement | 16276 | 166887 | HSB-E-Wing | E-611 | POSSIBLE ACM MATERIAL--PLEASE ABATE INSIDE ROOM E-611--SEE VICKIE WILSON OR JOHN BOOTH FOR MORE DETAIL | Booth, John | On Hold | |||
| Abatement | 16620 | 190349 | HSB-D-Wing | D559 | REMOVAL OF FOUR ASBESTO GRILLS 5"X5" EA | Bordin, Sandra | New | |||
| Estimate | 13829 | 995622 | HSB-T-Wing | school of nursing--3rd floor east end | Scope of Work: estimate to remove all existing carpet from east end of T wing 3rd floor----school of nursing | Bossett, Phil | 10/21/2005 | Estimate In Progress | ||
| Consultant | 17006 | 115398 | Ocean Teach Bldg | see scope | 2/12/09 asbestos or lead in rooms 1st,2nd and 3rd floor men rest room no# W/R 115398(RAB) |
Brattain, Richard | 2/13/2009 | Work In Progress | ||
| Consultant | 16751 | 115408 | Raitt Hall | #208 and 110 | 11/3/08 I need a Survey done for Asbestos and Lead in the Men rest room #208 and 110 we will be drilling ¼"holes into the walls at the Urinals.(RAB) |
Brattain, Richard | 11/4/2008 | Work In Progress | ||
| Consultant | 16738 | 115572 | Atmos Sci/Geophys | Mens Restrms throughout the building | need the walls check for Asbestos and Lead in all the men rest room at the Urinals. We will be drilling hole for the new urinals at Atmos Sci/Geophys |
Brattain, Richard | 10/30/2008 | Work In Progress | ||
| Consultant | 16723 | 115396 | Miller Hall | MRR'S ON ALL FLOORS | Can you test for Asbestos and Lead. Scope of Work: We will be drilling into the walls in the Men rest rooms replacing the Urinals on all floors |
Brattain, Richard | 10/21/2008 | Work In Progress | ||
| Consultant | 17568 | 003067 | UWMC-EE-Wing | EE806: | EE806: PLEASE CONDUCT A GOOD FAITH SURVEY. CONTACT BOB BURGY FOR PROJECT DETAILS. | Burgy, Robert | 9/24/2009 | Work In Progress | ||
| Estimate | 16659 | 186958 | UWMC-SW-Wing | SW300 | Will furnish drawings at walkthrough with Saeid for estimate.9-12-08 RCB Please enter estimate for abatement per walk through RCB |
Burgy, Robert | New | |||
| Estimate | 16658 | 156817 | UWMC-CC-Wing | CC404 SUITE | Please estimate the removal of the carpet tiles and any underlaying VCT, mastic and leveling compound that contains ACM in CC404,415,417,417b,417c,417B,417A. Include room NN521 in the estimate. See E-mail attachment for plan views of rooms. RCB 9-2 |
Burgy, Robert | 12/31/2008 | Estimate In Progress | ||
| Estimate | 16657 | 156817 | UWMC-CC-Wing | CC404 SUITE | Estimate removal of the VCT carpet and base in the entire suite per plan and include room NN521 in the estimate. For install of new sheet vinyl RCB |
Burgy, Robert | 9/22/2008 | Estimate In Progress | ||
| Estimate | 16427 | 151932 | UWMC-EA-Wing | outside EA-146F | Please enter an estimate for removing the duct outsde the door to EA146F. rcb 6-16-08 |
Burgy, Robert | 6/18/2008 | Estimate In Progress | ||
| Estimate | 16271 | 162887 | UWMC Surgery Pavilion / Treatment Ctr | 1004 | Please enter an estimate in the note pad to provide 4 penitrations through the wall removing the wall board only. If the wall contains insulation push it into the wall cavity leaving the hole clear. The holes will be approx 2'x3'. The edge of the dryw |
Burgy, Robert | 4/16/2008 | Estimate In Progress | ||
| Estimate | 15888 | 097596 | HSB-RR-Wing | RR746 | I need an estimate to remove the newly installed carpet and any remaining floor tiles RCB 11-07-07 |
Burgy, Robert | New | |||
| Estimate | 15461 | 045434 | UWMC-NN-Wing | NN631C | PLEASE ESTIMATE THE DUCT INSULATE PROBLEM IN NN630,NN622,NN614 AND AN ADJOINING HALLWAY. NEED TO COORDINATE THE WORK WITH MIKE BUSSERT. SOMETIME DURING THE WEEK OF 6-18-07 RCB |
Burgy, Robert | New | |||
| Estimate | 15192 | 081428 | HSB-A-Wing | A314 SUITE AND A300 | PLEASE ESTIMATE THE REMOVAL OF THE RUBBER BASE IN THE ENTIRE SUITE. 3-22-07 RCB CANCEL THE ESTMATE FOR ABATEMENT OF THE RUBBER BASE. RCB PLEASE SURVEY THE CARPET TILES AND MASTIC IN A314 SUITE AND A300 RECEPTION AREA. RCB 3-29-07 |
Burgy, Robert | New | |||
| Estimate | 14688 | 028520 | HSB-D-Wing | B447/461 | I WOULD LIKE TO WALK THIS WITH SAEID AND JIM TO WORK UP AND ESTIMATE FOR ABATEMENT. RCB 9-8-06 (PLS NOTE THIS IS FOR B-WING NOT D-WING) |
Burgy, Robert | New | |||
| Estimate | 14594 | 044641 | UWMC-SW-Wing | SW241 | PROVIDE ESTIMATE FOR DEMO OF WALLS CONTAINING LEAD AND LEAD DOORS. 2 DOOR JAMBS WILL BE DEMOED. ALSO PROVIDE THE CONTAINMENT NEEDED FOR THE ABATEMENT WORK IN THE ROOM AND THE COORIDOR. RCB 8-8-06 |
Burgy, Robert | 8/8/2006 | Estimate In Progress | ||
| Estimate | 14298 | 013455 | HSB-B-Wing | SUITE B241 | PLEASE GIVE US AN ESTIMATE TO ABATE ANY MATERIALS THAT MIGHT CONTAIN ASBESTOS PER THE PLAN. 4-14-06 |
Burgy, Robert | 4/19/2006 | Estimate In Progress | ||
| Estimate | 14249 | 018347 | HSB-RR-Wing | RR-744 | PLEASE ESTIMATE THE COST OF ABATEMENT. THE RUBBERBASE MASTIC CONTAINS LESS THEN 1% ASB. RCB.3-30-06 |
Burgy, Robert | 3/30/2006 | Estimate In Progress | ||
| Estimate | 17043 | 223141 | Harborview East Hospital | entire building | ASBESTOS LABELING ESTIMATE | Carroll, Rob | 2/26/2009 | Estimate In Progress | ||
| Estimate | 14039 | 008932 | Harborview East Hospital | SEE SCOPE | THE PROJECT AREA HAS TWO LAYERS OF CARPET OVER SUSPECTED VAT AND ACM MASTIC. THERE IS APPROXIMATELY 105 SQUARE FEET OF AREA. PLEASE REMOVEALL MATERAIL TO CONCRETE DECK AND SCRAPE ANY RESIDUAL RESIDUE. PLEASE ESTIMATE, NO TESTING REQUESTED. PREVIOUS SURVEY | Ciolek, Clay | 1/10/2005 | Estimate In Progress | ||
| Estimate | 14958 | 077342 | Anderson Hall | 202 | PLEASE PROVIDE ESTIMATE FOR TESTING ONE EACH, SAMPLE OF PAINT FOR LEAD, AND SUBSTRATE AT WATER DAMAGED AREA USING NORMAL TIME FRAME/TURN AROUND. BC | Clouse, Barbara | 1/9/2007 | Estimate In Progress | ||
| Abatement | 17552 | 006898 | HSB-T-Wing | T598J HALLWAY DRINKING FOUNTAIN AREA | Scope of Work: clean Post-it Marked ceiling tiles over drinking fountain Other Contacts: Bill Chase | Collins, Gary | 9/23/2009 | 1 | Night | Scheduled |
| Consultant | 16764 | 202087 | HSB-E-Wing | E-106 | Scope of Work: sample around penetration by door to E106. See Gary Collins for details. |
Collins, Gary | 11/10/2008 | Work In Progress | ||
| Consultant | 16660 | 194538 | HSB-B-Wing | B-181 Alterations Elec Shop | Scope of Work: 1 hour abatement. There is some white material on ground by bending machine in alterations electric shop. We need it tested for lead and asbestos |
Collins, Gary | 9/23/2008 | Work In Progress | ||
| Consultant | 17183 | 200467 | Physical Plant Off | SEVERAL ROOMS | TEST FLOORING IN SEVERAL ROOMS | Conrad, Landon | 4/20/2009 | Work In Progress | ||
| Consultant | 16749 | 190359 | Plant Svcs Bldg | 229B John Eckhouse new office | 11/3 Please provide hazmat testing for glue on ceiling tile & mastic in room 229B Plant Services. Call Landon for more detail. LMC. |
Conrad, Landon | 11/4/2008 | Work In Progress | ||
| Consultant | 16737 | 200467 | Physical Plant Off | 100D, 122 AND 1 | 10/24 Work request approved for hazmat testing of areas in PPOB. This has been discussed with Dave & Saeid. LMC. |
Conrad, Landon | 11/10/2008 | Work In Progress | ||
| Consultant | 16676 | 193508 | Plant Annex 3 - retired | see scope | 9/30 Please sample drywall, paint, base & carpet mastic & subfloor board in 1st floor of Annex 7 (Central Zone Bld). Area is unoccupied. Contact Landon for details. Thanks! |
Conrad, Landon | 9/1/300 | Work In Progress | ||
| Consultant | 16576 | 176622 | UW Tower Building S | 203, 304 & 403 | 8/13 Please provide hazmat testing in coat closets that will become telecom closets in rooms 203, 304 & 403 at UW Tower S Building. Carpet mastic, base mastic & wall board requries testing. Splined ceiling will be removed. Landon is available to meet |
Conrad, Landon | 8/20/2008 | Work In Progress | ||
| Estimate | 17456 | 008452 | Bagley Hall | 307 | PLEASE PROVIDE ESTIMATE TO REMOVE FUME HOOD IN BAGLEY 307. INCLUDE ABATEMENT OF UTLITY PIPING IN LAB AREA ON 2ND FLOOR. PROJECT WAS SCOPED BY SAEID ON 8/5. |
Conrad, Landon | 8/10/2009 | Estimate In Progress | ||
| Estimate | 14254 | 024881 | Denny Hall | 406 | 3/30 PLEASE PROVIDE A COST ESTIMATE TO TEST CEILING TILE & MASTIC IN ROOM 406 AT DENNY HALL. DAVE & SAEID ARE AWARE OF THIS REQUEST. LMC. |
Conrad, Landon | 3/30/2006 | Estimate In Progress | ||
| Estimate | 13439 | 972376 | Balmer Hall | ROOM 314 | 7/6 PLEASE PROVIDE AN ESTIMATE TO REMOVE ACOUSTIC SPRAY ON INSULATION TO MOUNT CONDUIT ON CEILING IN ROOM 314 BALMER. INSULATION IS KNOWN TO CONTAIN 65 ASBESTOS. MARKED AREAD WILL NEED TO BE REMOVED. PLEASE MEET WITH LANDON TO SCOPE PROJECT. LMC. | Conrad, Landon | 7/7/2005 | Estimate In Progress | ||
| Consultant | 16856 | 208671 | Big Beef Creek | see scope | Scope of Work: Hazmat survey in support of the Sensaphone project. Contact Brad Druktenis for project scope or plans for your use. Phone 206-616-0811 Requested Turnaround, Asbestos: 1-day |
Druktenis, Brad | 12/11/2008 | Work In Progress | ||
| Estimate | 13823 | 926172 | HSB-RR-Wing | Floors 1 - 4 | PRICE ONLY!! PROVIDE PRICE TO ABATE PIPES AND CHASES ON RR SAM'S WING HALLWAY FLOORS 1 THROUGH 4. (NEED FOUR SEPARATE ESTIMATES, ONE FOR EACH FLOOR) HALLWAY 1ST FLOOR - 5 CHASES / HALLWAY 2ND FLOOR - 8 CHASES / HALLWAY 3RD FLOOR - 8 CHASES / HALL |
Druktenis, Brad | 10/19/2005 | Estimate In Progress | ||
| Estimate | 13701 | 983130 | HSB-B-Wing | B414 | PRICE TO ABATE CARPET AND WALL BASE. CLEAN ANY VCT TILES THAT POP UP READY FOR PATCHING. THANKS, BRAD IF WE GET THIS PRICE TODAY AND GET APPROVAL FROM THE CLIENT WE WOULD LIKE ABATEMENT TO BE PERFORMED WEDNESDAY NIGHT 9/14. |
Druktenis, Brad | 9/14/2005 | Estimate In Progress | ||
| Estimate | 13580 | 975550 | UWMC-EB-Wing | NE6233 | PROVIDE COST FOR HAZMAT SURVEY IN NE6233 TUB ROOM. WE WILL BE REMOVING THE TUB AND SURROUND, SINK, WALL TILE, CAPING PLUMBING IN THE FLOOR AND WALLS. THANKS, BRAD |
Druktenis, Brad | 8/11/2005 | Estimate In Progress | ||
| Estimate | 13538 | 911457 | HSB-BB-Wing | PRICE TO ABATE ACM ON CEILING FOR NEW CEILING WIRES AND FOR ELECTRICAL AND TO REMOVE SLIDING DOOR TOP TRACK. GET ME A PRICE. I TALKED TO SAEID AND JIM PARSLEY AND THEY WILL SCHEDULE THE WORK FOR WEDNESDAY 8/3. BRAD 221-3126 |
Druktenis, Brad | 8/1/2005 | Estimate In Progress | |||
| Estimate | 13508 | 955206 | HSB-D-Wing | ROOMS D663, D663A, D663B, AND D669. | PRICE FOR ABATEMENT ONLY AT THIS TIME. ABATE SECTION OF WALL BASE. ABATE SELECTED VCT FLOOR TILES. REMOVE AND DISPOSE OF TWO SINKS WITH UNDERCOATING. THIS WILL REQUIRE A WALKTHROUGH IN ORDER TO PRICE THE ABATEMENT. THANKS, BRAD 7/22/05 THIS WORK IS I |
Druktenis, Brad | 7/25/2005 | Estimate In Progress | ||
| Estimate | 15184 | 202078 | UWMC-NE-Wing | 4 North | Scope of Work: Estimate to demo sheet vinyl flooring & bead blast mastic from slab. | Dunham, Dick | 3/30/2007 | Estimate In Progress | ||
| Estimate | 14131 | 10707 | Henderson Hall | BASEMENT | Scope of Work: ESTIMATE TO Abate +/- 3' of pipe in basement. Other Contacts: Ray Hartman; Jim Fahey | Eatch, Becki | 2/8/2006 | Estimate In Progress | ||
| Estimate | 15808 | 123123 | Sandpoint Bldg #9 | ABATE APPROX 18,760 LF OF PIPING THROUGHOUT THE BUILDING. THE SCOPE IS LIMITED TO ALL THE EXPOSED PIPING AND PIPIING ABOVE THE DROPPED CEILING ONLY. | Eng, Gary | 10/8/2007 | Estimate In Progress | |||
| Estimate | 15773 | 127949 | Sandpoint Bldg #9 | throughout | ALSO, NEED ESTIMATE FOR ASBESTOS REMOVAL. | Eng, Gary | 9/25/2007 | Estimate In Progress | ||
| Consultant | 16600 | 188230 | W Trunk Tunnel | near Bagley | SURVEY/SAMPLE FOR POSSIBLE ASBESTOS CONTACT JAMES FOR EXACT LOCATION NEAR BAGLEY HALL | Evans, James | 8/25/2008 | Work In Progress | ||
| Estimate | 13754 | 991409 | HSB-T-Wing | 7th FLR | WI-FI ASBESTOS ABATEMENT | Evans, James | 10/10/2005 | Estimate In Progress | ||
| Estimate | 13686 | 989105 | HSB-T-Wing | 6TH FLOOR CENTR | WI-FI ABATEMENT ESTIMATE NEEDED | Evans, James | 9/16/2005 | Estimate In Progress | ||
| Estimate | 13674 | 985160 | HSB-T-Wing | 6TH FLOOR WEST | WI-FI ABATEMENT ON 6TH FLOOR WEST | Evans, James | 9/7/2005 | Estimate In Progress | ||
| Consultant | 14473 | 201228 | Benson Hall | 238, 248 and 254 | Scope of Work: Provide Haz Mat consulting services for monitoring and oversight of Haz Mat remediation during the construction phase. Hazardous materials remediation will be completed by the JOC contractor per Hazardous Material Survey Report dated 1/29/ | Fernandes, Mike | 8/10/2006 | Work In Progress | ||
| Abatement | 17600 | 018245 | McCarty Hall | Kitchen (see scope) | PLEASE REPAIR DAMAGED PACM LAGGING ON PIPING IN WALK-IN REFRIGERATORS IN KITCHEN BEING USED AS STORAGE AREAS FOR THE CAFE SUPPLIES. | Fields, Dennis | 9/29/2009 | 2 | Night | Scheduled |
| Abatement | 17465 | 004781 | McMahon Hall | North Tower | ENCAPSULATE ACM FIRE-PROOFING PAPER WHERE IDENTIFIED ON CORRIDOR WALLS FOR THE MONTH OF SEPTEMBER | Fields, Dennis | New | |||
| Consultant | 17320 | 242050 | Laurel Village C | see scope | HAZMAT SURVEY FOR EXTERIOR SIDING REPLACEMENT PROJECT AT LAUREL VILLAGE CHILDREN'S CENTER AND BUILDINGS "Q", "T", "U", AND "Y". PLEASE CONTACT DENNIS FOR DETAILS. | Fields, Dennis | 6/9/2009 | Work In Progress | ||
| Estimate | 16338 | 136863 | CHDD South | 1st and 2nd floor hallways | ESTIMATE TO ABATE CEILING TILES | Frankenhauser, Al | 5/12/2008 | Estimate In Progress | ||
| Abatement | 17444 | 001272 | McCarty Hall | drop off | Door will be dr | Freelund, Dave | New | |||
| Consultant | 16931 | 215978 | Ocean Teach Bldg | E.ENTRY/COPY RM | PLEASE TEST YELLOW PAINT FOR LEAD. STEVE SCHMIDER CAN GIVE LOCATION AND CAN BE REACHED ON CELL PHONE 206-391-7189. THANK YOU. |
Freelund, Dave | 1/14/2009 | Work In Progress | ||
| Consultant | 16756 | 196682 | Ocean Teach Bldg | HLLWAY NR RM. 7 | PLEASE TEST SAMPLE THAT DAVE YACONO HAS. THANKS DAVE FREELUND | Freelund, Dave | 12/2/2008 | Work In Progress | ||
| Estimate | 13757 | 985157 | HSB-BB-Wing | BB622 | CLIENT HAS REQUESTED AN ESTIMATE FOR THE ABATEMENT ON THIS JOB. WE WOULD NEED TO HAVE THE RUBBER BASE ABATED ON THE RIGHT HAND SIDE OF THE FIRST ROOM AS YOIU WALK IN. PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS. THANKS DAVE |
Freelund, Dave | 9/28/2005 | Estimate In Progress | ||
| Abatement | 17602 | 018000 | HSB-T-Wing | T-474A | T474A MISSING CEILING TILE. PLEASE CALL FOR ROOM AVAILABILITY. 32 HAZMAT: ABATE AND REPLACE CLG. TILE |
Fyfe, Stewart | New | |||
| Abatement | 17601 | 018048 | HSB-T-Wing | T-498 | T498 ROOM NEEDS REPAIR. PLEASE CALL FOR ROOM AVAILABILITY - STAINED CEILING TILE 32 HAZMAT: REMOVE AND REPLACE STAINED CLG. TILE |
Fyfe, Stewart | New | |||
| Abatement | 17598 | 017886 | HSB-T-Wing | T-473 | T473 CEILING TILES NEED REPLACING. PLEASE CALL FOR ROOM AVAILABILITY | Fyfe, Stewart | 9/30/2009 | 1 | Night | Scheduled |
| Abatement | 17597 | 017889 | HSB-T-Wing | T478 | T478 CRACKED CEILING TILES. PLEASE CALL FOR ROOM AVAILABILITY. 32 HAZMAT: REPLACE CRACKED CLG. TILE |
Fyfe, Stewart | 9/30/2009 | 1 | Night | Scheduled |
| Abatement | 17573 | 016410 | HSB-K-Wing | HALLWAY NEAR K540 | BROKEN FLOOR TILE IN HALLWAY NEAR K540 32 HAZMAT: ABATE BROKEN FLOOR TILE |
Fyfe, Stewart | 9/24/2009 | 1 | Day | Scheduled |
| Consultant | 16795 | 204186 | HSB-A-Wing | A344 | PLEASE TEST MARKED FLR. TILE,MASTIC, AND BASE FOR HAZARDS: THIS IS A CUSTODIAL CLOSET IN A-300. TWO DAY TURNAROUND SJF 11/19/08 |
Fyfe, Stewart | 11/20/2008 | Work In Progress | ||
| Consultant | 16767 | 201473 | HSB-H-Wing | H418 | TEST GASKET MATERIAL AROUND ABANDONED FLR. UTILITY BOX FOR HAZARDS: WALKED JOB WITH KELVIN SJF 11/7/08 ROUTINE TURNAROUND |
Fyfe, Stewart | 11/10/2008 | Work In Progress | ||
| Consultant | 16766 | 202241 | HSB-H-Wing | ELEV-22 H WING | TEST FLR TILE AND MASTIC FOR HAZARDS: SJF | Fyfe, Stewart | 11/10/2008 | Work In Progress | ||
| Consultant | 16755 | 201473 | HSB-H-Wing | H418 | TEST 12X12 FLOOR TILE,MASTIC, BASE AND BASE MASTIC H-418&H-422 LARGE LAB AREA.SPOKE WITH SAIED ABOUT JOB. (CONTACT STEWART FOR DETAILS) ONE DAY TURNAROUND SJF 11/4/08 |
Fyfe, Stewart | 11/10/2008 | Work In Progress | ||
| Consultant | 16677 | 195455 | HSB-F-Wing | F545 | please sample loose wall material behind falling ceramic tiles for hazards Please sample paint for hazards. I spoke with Saied about job scope.Stew 9/30 |
Fyfe, Stewart | 10/1/2008 | Work In Progress | ||
| Consultant | 16588 | 187174 | HSB-I-Wing | I534A | Please test flr. tile, mastic, and concrete for hazards. Stew 8/19 Routine turnaround. |
Fyfe, Stewart | 8/20/2008 | Work In Progress | ||
| Estimate | 17067 | 223140 | HSB-T-Wing | T276 | 32 HAZMAT: PROVIDE ESTIMATE FOR ABATEMENT OF 12 2X2 CLG. TILE AND REPLACEMENT. SJF 3/5/09 |
Fyfe, Stewart | 3/6/2009 | Estimate In Progress | ||
| Abatement | 17499 | 000657 | HSB-K-Wing | K-054 | K-054 SEAL TRENCH DRAIN FOR WALK IN COOLER. IT IS LEAKING DOWN INTO K-018A SHOP 32 PLEASE PROVIDE A MOLD INSPECTION IN K-018A & ABATE AS NEEDED OR PROVIDE RECOMMENDATIONS |
Garberg, Dennis | 9/21/2009 | 1 | Night | Scheduled |
| Abatement | 16469 | 134724 | HSB-J-Wing | 3rd floo hallway | need wall opeded up on fourth flour just like the rest it is marked with blue tape. 07/07/08 iam sitting in for john booth so if you need to contact me outside the office my pager is 206-663-6852 and this is and this is scott garrioch |
Garrioch, Scott | On Hold | |||
| Abatement | 17542 | 006417 | Marine Sciences | 355A | PANELS INSIDE WALKIN MAY HAVE BEEN GLUED TO WALLS THAT CONTAIN LEAD. NEED TO HAVE THIS INVESTIGATED FOR OPTIONS TO REINSALL OR REMOVE PANELS COMPLETELY. SEE GG IN REFER SHOP FOR DETAILS (5-8835). | Greene, Gary | New | |||
| Abatement | 17596 | 017915 | Truly House | Truly House UW Bothell | INSPECT AND ABATE EXTERIOR PAINT FOR LEAD FLAKES | Guerrero, Tony | 9/29/2009 | 1 | Day | Scheduled |
| Estimate | 13710 | 3902 | HSB-T-Wing | REPLACE COOLING TOWER T-WING | Scope of Work: Asbestos specification, drawings and reports already exist for this project. Drawings are complete now and CPO office needs to a rallity check on value we should be using for abatement budget. Please provide the following. a.) What is it g |
Harris, Frank | 9/15/2005 | Estimate In Progress | ||
| Abatement | 17605 | 010216 | Kincaid Hall | see scope | PLEASE ABATE THE FOLLOWING AREAS OF FLOOR TILE AT KINCAID HALL- TILES HAVE BEEN MARKED: LOADING DOCK ENTRY DOOR - 3 PIECES; IN ROOM 221-15 TILE; ROOM 434 - 3TILE; ROOM 522- 2 TILE; ROOM 124B- 10 TILE; ROOM 158- 6 TILE. THANK-YOU JH | Harris, Jackie | 10/6/2009 | 1 | Night | Scheduled |
| Consultant | 17358 | 243890 | Roberts Hall | entrance directly under Sky Bridge | Please test floor tile for hazmat - will be replacing approximately 100 SF in tile at entrance directly under Sky Bridge. Thank-you. JH |
Harris, Jackie | 6/25/2009 | Work In Progress | ||
| Consultant | 16742 | 199036 | Haggett Hall | DS016 | Please test base and mastic for hazmat. Thank-you, JH (call Randall Rebe for exact location 543-1057 or call Jackie for location also) | Harris, Jackie | 10/30/2008 | Work In Progress | ||
| Consultant | 16693 | 179390 | Meany Hall | 150C | Please test rubber base and masstic in areas as per Tom Burke. Thank-you. JH |
Harris, Jackie | 10/7/2008 | Work In Progress | ||
| Consultant | 16688 | 174326 | HSB-BB-Wing | ELEV255 | Please test for hazmat on this vinyl and adhesive. Thank-you. JH | Harris, Jackie | 10/7/2008 | Work In Progress | ||
| Consultant | 16648 | 193398 | Bagley Hall | 190 | Please test for hazmat on the blue 4" base, mastic and the existing carpet adhesive in this room 190. Thank-you. JH |
Harris, Jackie | 9/19/2008 | Work In Progress | ||
| Estimate | 17151 | 226554 | Mech Engr Bldg | G012 | 4/6/09 Please estimate to abate appoximately 70LF of 6" rubber base. Thank-you. JH |
Harris, Jackie | 4/7/2009 | Estimate In Progress | ||
| Estimate | 16897 | 210741 | CHDD South | 104,104AB, 102 | Please estimate to abate 2 separate areas - probably will be done on separate dates: room 102 - approximately 144 SF of carpet and underlying vinyl floor tile along with 50 LF of 4" rubber base. room 104 A,B & C - approximately 540 SF of carpet and und |
Harris, Jackie | 1/6/2009 | Estimate In Progress | ||
| Estimate | 16612 | 166993 | Schmitz Hall | 440 | Please estimate to abate approximately 210SF of carpet and underlying floor tile that is suspected to contain asbestos. Figure on removing the existing approximate 60LF of rubber base while you are there. Thank-you. JH |
Harris, Jackie | 9/8/2008 | Estimate In Progress | ||
| Estimate | 16450 | 176962 | Padelford Hall | B110S | Please estimate to abate approximately 112 SF of floor tile and tack strip in room. Floor tile contains asbestos. Thank-you. JH |
Harris, Jackie | 6/26/2008 | Estimate In Progress | ||
| Estimate | 15570 | 115729 | HSB-T-Wing | T621 | Please estimate to abate 224 SF of carpet and 60 LF of 4" rubber base. Client is requesting new carpet to be installed. Thank-you, JH |
Harris, Jackie | 7/25/2007 | Estimate In Progress | ||
| Estimate | 15480 | 109896 | CHDD School | CD-130 | PLEASE ESTIMATE TO ABATE APPROXIMATELY 120LF OF 4" RUBBER BASE. (I BELIEVE THE MASTIC WAS 7% ASBESTOS ON A PREVIOUS PROJECT - WR #036238) THANK-YOU, JH |
Harris, Jackie | 6/25/2007 | Estimate In Progress | ||
| Estimate | 15010 | 037070 | Denny Hall | 1ST & 2ND FLR HALLWAYS | PLEASE ESTIMATE TO ABATE APPROXIMATELY 300 LF OF TACK STRIP AND RUBBER BASE AND ALSO METAL TRIM IN 6 DOORWAYS. THANK-YOU, JH |
Harris, Jackie | 1/29/2007 | Estimate In Progress | ||
| Estimate | 14753 | 018499 | CHDD Clinic | see scope | PLEASE ESTIMATE TO ABATE APPROXIMATELY 300 LF OF 4" RUBBER BASE. MOST RUBBER BASE IS IN THE HALLWAYS. THANK-YOU JH |
Harris, Jackie | 10/9/2006 | Estimate In Progress | ||
| Estimate | 14577 | 045502 | Guthrie Annex 1 | 105 | PLEASE ESTIMATE TO ABATE APPROXIMATELY 60LF OF 4" RUBBER COVE BASE. THANK-YOU, JH |
Harris, Jackie | 8/3/2006 | Estimate In Progress | ||
| Estimate | 14528 | 041507 | CHDD Clinic | CD454 | PLEASE ESTIMATE TO ABATE APPROXIMATELY 60LF OF 4' X 4" RUBBER COVE BASE. ADHESIVE SUSPECTED TO CONTAIN ASBESTOS. THANK-YOU, JH |
Harris, Jackie | 7/20/2006 | Estimate In Progress | ||
| Estimate | 14432 | 030381 | HSB-D-Wing | D570A | PLEASE ESTIMATE TO PICK-UP AND DISPOSE OF SINK (UNDERCOATED SUSPECT OF ASBESTOS) THAT WILL BE BAGGED BY CARPENTERS. SINK APPROXIMATELY 18" X 24" X 12" DEEP. CARPENTERS WILL CUT COUNTERTOP TO LEAVE SINK INTACT. THANK-YOU, JH |
Harris, Jackie | 6/6/2006 | Estimate In Progress | ||
| Estimate | 14394 | 028804 | HSB-BB-Wing | RMS BB1318 AND BB1326 | PLEASE ESTIMATE TO ABATE APPROXIMATELY 450 SF OF VCT AND 200 LF OF 4" RUBBER BASE IN RMS BB1318 AND BB1326. WILL BE INSTALLING NEW VINYL. THANK-YOU. JH |
Harris, Jackie | 5/23/2006 | Estimate In Progress | ||
| Estimate | 13994 | 006412 | HSB-T-Wing | T-337 | 12/21/05 PLEASE ESTIMATE TO ABATE APPROXIMATELY 60LF OF 4" RUBBER COVE BASE. THANK-YOU, JH |
Harris, Jackie | 12/22/2005 | Estimate In Progress | ||
| Estimate | 13960 | 001529 | Wilcox Hall | 234,230,236 | PLEASE ESTIMATE TO ABATE APPROXIMATELY 2,000 SQUARE FEET OF VCT AND ADHESIVE AND APPROXIMATELY 600 LF OF 4" RUBBER BASE. SUBFLOOR HAS TO BE VERY CLEAN AS CLIENT IS REQUESTING NEW SOLID FLOORING TO BE INSTALLED. JH | Harris, Jackie | 12/12/2005 | Estimate In Progress | ||
| Estimate | 13688 | 965806 | Johnson Annex A | CORR 200M,N | PLEASE ESTIMATE TO ABATE APPROXIMATELY 120LF OF BLACK 4" RUBBER COVE BASE THAT WAS FOUND TO CONTAIN LESS THAN 1% ASBESTOS. THANK-YOU JH |
Harris, Jackie | 9/12/2005 | Estimate In Progress | ||
| Estimate | 14977 | 067985 | Fisheries Center | 222A | ESTIMATE TO REMOVE 3 FUME HOOD BLOWER FAN UNITS FROM ROOF OVER 222A. SAEID HAS DETAILS. CH |
Herron, Carl | 1/18/2007 | Estimate In Progress | ||
| Abatement | 15519 | 111852 | Balmer Hall | 061 | THERE IS A CONTROL VALVE IN THE CEILING THAT WILL CONTINUE TO CONDENSE AND LEAK UNTIL IT IS INSULATED. THANK YOU FOR YOUR ATTENTION TO THIS MATTER. JEFF H. SHOP 15PLUM |
Hnilo, Jeff | New | |||
| Consultant | 17425 | 002653 | HSB-AA-Wing | AA027 | GOOD FAITH SURVEY OF AA027 | Hoggarth, Larry | 7/23/2009 | Work In Progress | ||
| Consultant | 16788 | 090803 | HSB-RR-Wing | RR419 | Please test the wiring for ACM in the electric panel on the window wall in HSC RR419.LH | Hoggarth, Larry | 12/2/2008 | Work In Progress | ||
| Consultant | 16750 | 200455 | McCarty Hall | 234 | Test the entry door to room 234 in the south tower of McCarty. Please proceed with this test. LH 11/3/08 | Hoggarth, Larry | 11/4/2008 | Work In Progress | ||
| Consultant | 16669 | 090803 | HSB-RR-Wing | RR419 | Proceed with this good faith surrvey of RR419. LH | Hoggarth, Larry | 9/25/2008 | Work In Progress | ||
| Consultant | 16566 | 178796 | HSB-AA-Wing | AA512 | 8/11/08 This survey has been approved. Please survey these rooms as soon as possible.LH |
Hoggarth, Larry | 8/12/2008 | Work In Progress | ||
| Consultant | 16539 | 133697 | Northlake Bldg | see scope | Please have a hazmat survey of the west wide exterior paint at the Northlake bldg. This needs to be a one day turn around. Call Larry Hoggarth at 206-979-1146 for exact location. |
Hoggarth, Larry | 8/4/2008 | Work In Progress | ||
| Consultant | 14727 | 056403 | HSB-J-Wing | J229 AND J234 | 9/21/06 THIS WR IS FOR A SURVEY OF J229 AND J234 SEE LARRY HOGGARTH FOR DETAILS LH |
Hoggarth, Larry | 9/29/2006 | Work In Progress | ||
| Estimate | 16159 | 154697 | HSB-D-Wing | D452 | Would estimate the cost of a good faith survey for D452. I have a project to remodel this room making it in to offices. |
Hoggarth, Larry | 3/6/2008 | Estimate In Progress | ||
| Estimate | 14991 | 058902 | HSB-I-Wing | see scope | 1/24/07 THIS PHASE IS FOR AN ESTIMATE TO HAVE THE ABATE CONTRACTOR OPEN WALLS AND DRILL HOLES IN SINKS IN 3 AREAS OF I WING TO INSTALL EYE WASHES. I DID A WALK THROUGH WITH SAEID AND THE ABATEMENT CONTRACTOR ON 1/23/07. LH |
Hoggarth, Larry | New | |||
| Consultant | 16945 | 217194 | Mueller Hall | Rm 178 Computer Lab | Scope of Work: A special key to enter is to be provided by proffessor Syeleczki via Harley We want to pull up the old carpet and install a tile or vinyl floor |
Hughes, Harley | 1/26/2009 | Work In Progress | ||
| Consultant | 16812 | 205269 | Physics/Astron Bar | main entrance | Scope of Work: Moisture readings of the wallboard needed ASAP ! see Harley Room/Location: main Entrance north of Bowling Pin Statue | Hughes, Harley | 11/25/2008 | Work In Progress | ||
| Consultant | 16627 | 186305 | Guthrie Annex 1 | crawl space | Sample dirt per employee request harley 09/09/08 | Hughes, Harley | 9/9/2008 | Work In Progress | ||
| Consultant | 16595 | 188014 | Aero & Eng Resch | 041 | CHECK THE BLACK SUBSTANCE ON THE WALL sample wall for lead and asbestos (NEED Consultant to Sample and define piant, black sealant and leakage accomulations. Harley 21/08/08) |
Hughes, Harley | 8/21/2008 | Work In Progress | ||
| Consultant | 16556 | 167395 | Bagley Hall | 293 | FUME HOOD 436 FAILED DUE TO LO AIRFLOW Asbestos - Take samples and report | Hughes, Harley | 8/6/2008 | Work In Progress | ||
| Consultant | 16426 | 138789 | Bloedel Hall | MECH ROOM | please test/abate pipe insulation on and around condensate tank in pulp lab. Contact Marvin Romack for more information/details.685-8808 |
Hughes, Harley | 6/18/2008 | Work In Progress | ||
| Abatement | 17594 | 017820 | UWMC-SE-Wing | UWMC OPERATING ROOM #4 (SE233). | PROVIDE MOLD ABATEMENT FROM INSIDE UWMC OPERATING ROOM #4 (SE233). THIS ROOM IS LOCATED BEHIND A RED LINE AND REQUIRES WORKERS TO GOWN UP BEFORE CROSSING THAT LINE. PLEASE COORDINATE WITH IBO SEZGIN SO HE CAN COORDINATE WITH UWMC STAFF TO SCHEDUL |
Jobe, Eddy | 9/28/2009 | 5 | Night | Scheduled |
| Estimate | 16989 | 205688 | HSB-BB-Wing | BB389 | NEED TWO SEPARATE ESTIMATES: Need an estimate to repair the friable pipe insulation above the ceiling. INCLUDES REMOVAL OF CEILING. AND also need separate estimate to abate the flooring. |
Jobe, Eddy | 2/12/2009 | Estimate In Progress | ||
| Estimate | 13562 | 974792 | Engineering Annex | FOR SHOP 32HAZM, PLEASE PROVIDE ESTIMATE TO CLEAN UP THE ATTIC AND REMOVE THE LOOSE INSULAIONS. 221-7820 THANKS MKJ 08/04/05 |
Jue, Ming | 8/5/2005 | Estimate In Progress | |||
| Estimate | 13474 | 201030 | Haggett Hall | Elevator #96 | Estimate to provide a good faith survey, plus collect samples of lead as needed. | Kangas, Ashley | 7/15/2005 | Estimate In Progress | ||
| Consultant | 16726 | 196242 | Nuc Phys Cycltron | 205 | TEST ROOM 205. 1) WALLS 2)BASE / MASTIC TEST FOR LEAD,ASBESTOS THANKS,LANCE |
Karvonen, Lance | 10/23/2008 | Work In Progress | ||
| Consultant | 17040 | 223100 | Bryants Bldg | LOCK SHOP OFFIC | SHOP PURCHASED FIRE PROOF SAFE FROM SURPLUS AND WHITE POWDER IS PRESENTon frame and drawer guides..need to verify no ACM prior to use | Kelsey, Mickey | 2/26/2009 | Work In Progress | ||
| Consultant | 16699 | 189516 | HSB-K-Wing | K507A | 10/08/08--Please test core of door for ACM. White powder present. Lock needs to be changed to provide secured area so short turn around is requested. contact Eric Apoe @ 793-2897 or Mickey Kelsey @ 391-7237 with the results.......mkelsey |
Kelsey, Mickey | 10/8/2008 | Work In Progress | ||
| Abatement | 17609 | 018450 | HSB-T-Wing | T-322 | PLEASE ABATE MINIMUM CEILING AREA TO ACCESS MIXING BOX AND SUPPLY AIR DIFFUSER. DK. | King, Dave | 10/5/2009 | 1 | Night | Scheduled |
| Consultant | 16549 | 184426 | Power Plant - Building | Power Plant systems | INSULATION TESTED IN THE POWER PLANT ... STEAM TURBINE GENERATOR. SEE ALAN HORNE FOR DETAILS 543-3716. ONE DAY TURNAROUND. |
Kirschenbaum, Mark | 8/5/2008 | Work In Progress | ||
| Estimate | 16009 | 148488 | HSB-T-Wing | Estimate for the removed off Asbestos board. See Herman for location. | Lanier, Herman | 1/3/2008 | Estimate In Progress | |||
| Consultant | 16615 | 189790 | Transportation Svc | MAINT SHOP | CHECK PIPE INSULATION IN SHOP 4 ASBESTOS | Linscott, Eric | 9/3/2008 | Work In Progress | ||
| Consultant | 16734 | 196388 | Nuc Phys Cycltron | RM 109A TO 103 | Need survey of varios materials in Rm 109A please contact Jeff Lueck at 206-849-7697 for walk through***JCL |
Lueck, Jeff | 10/30/2008 | Work In Progress | ||
| Estimate | 14968 | 076272 | HSB-T-Wing | T433A | 1/12/06-NEED ESTIMATE FOR CLEANING CEILING TILES IN T-WING. CONTACT JEFF AT 543-4314***JCL |
Lueck, Jeff | 1/1/117 | Estimate In Progress | ||
| Estimate | 14556 | 045551 | HSB-T-Wing | T602 | PLEASE CONTACT JEFF LUECK FOR ESTIMATE TO CLEAN CEILING TILES IN HALL OUTSIDE ROOM T-602. 3-4314***JCL |
Lueck, Jeff | 8/3/2006 | Estimate In Progress | ||
| Consultant | 16557 | 186517 | Harborview East Hospital | 3EH-43 | TEST VCT ADHESIVE FOR ASBESTOS | McGee, Joseph | 8/6/2008 | Work In Progress | ||
| Estimate | 14391 | 020183 | Art Building | basement 09 | PLEASE PROVIDE ESTIMATE TO REMOVE PIPE INSULATION FROM PIPING TO BE REMOVED IN ART 09. SEE LESLIE T, OR ED MCKINLEY FOR MORE INFO AND/OR TO ARRANGE A SITE VISIT. (543-1049) |
McKinley, Ed | 5/19/2006 | Estimate In Progress | ||
| Consultant | 16599 | 158843 | IMA | IPOOL MECH RM | PLEASE TEST PAINT ON LADDER & IMPELLER PIPES IN SURGE TANK FOR PRESENCES OF LEAD. | Mckinney, Bill | 8/25/2008 | Work In Progress | ||
| Consultant | 16593 | 158843 | IMA | pool | PLEASE TEST ALL FOUR WALSL AROUND POOL FOR LEAD AND ASBESTOS, REQUEST ONE HOUR TURN AROOUND. (TESTING REQUIRED SO MORE FALL RESTRAINT ANCHORS CAN BE INSTALLED) CONTACT AL SHERMAN @ OFFICE # 685-8805 OR CELL (206) 465-7996 OR BILL MC KINNEY @ OFFICE #68 | Mckinney, Bill | 8/21/2008 | Work In Progress | ||
| Consultant | 16567 | 187009 | Stadium | LOWER BOWL SEAT | LEAD TCLP ON GOLD, PURPLE BLEACHERS | Mckinney, Bill | 8/13/2008 | Work In Progress | ||
| Consultant | 16602 | 188342 | Music Bldg | 015 | TEST CEILING TILES | Mills, Wayne | 8/25/2008 | Work In Progress | ||
| Consultant | 16731 | 200444 | McMahon Hall | 1ST FL LOBBY | TEST THE LOBBY FLOOR FOR ASBESTOS | Morgan, Bob | 10/28/2008 | Work In Progress | ||
| Consultant | 16541 | 182426 | Bryants Bldg | 100Q | UWPD FLOOR ASBESTOS DISTURBANCE/HALLWAYCOULD FOLLOW UP TO SEE WHEN EH&S WILL BE DOW N TO FIX OUR FLOOR. WE HAVE HALF THE HALL BLOCKED BY THIS TAPED OFF AREA. IT HAS BEEN LIKE THAT FOR DAYS NOW. THANKS GAYLE |
Morgan, Bob | 8/4/2008 | Work In Progress | ||
| Estimate | 14579 | 030900 | Mercer Hall | 163 | IN THE LIVING AREA OF THE UNIT THE LAGGING ON THE HEAT PIPES HAD BEEN MISTED--WE NOW NEED TO REPLACE THE HEAT VAVLE AND NEED TO GET AN ESTIMATE. HOUSING HAS AGREED THAT IT WOULD BE BEST TO REMOVE ALL THE ASBESTOS IN THE ROOM AT THIS TIME. PLEASE CONTACT B | Morgan, Bob | 8/4/2006 | Estimate In Progress | ||
| Estimate | 14063 | 011260 | Condon Hall | SEE SCOPE | NEED ESTIMATE TO ABATE PIPE LAGGING IN RESTROOM CLUSTERS. NEED TWO ESTIMATES...ONE FOR DOING JUST ONE CLUSTER AND ONE ESTIMATE FOR DOING ALL FOUR CLUSTERS. | Morgan, Bob | 1/18/2006 | Estimate In Progress | ||
| Consultant | 16715 | 199177 | McCarty Hall | IAN DOMAIN | PLEASE TEST FOR ASBESTOS ON THE TERRAZZO WE ARE GOING TO WORK ON THE TERRAZZO FLOOR OF IAN DOMAIN LEVEL, PLEASE TEST THE ASBESTOS. |
Nguyen, Khan | 10/16/2008 | Work In Progress | ||
| Abatement | 16167 | 157605 | HSB-H-Wing | H180 | PLEASE ABATE 4 TILES MARKED IN THIS ROOM FOR MOLD--LEON | Norton, Leon | On Hold | |||
| Abatement | 17613 | 010884 | Kincaid Hall | 600-J | PLEASE ABATE 170 FT/SQ. OF VCT. I WILL MARK THE FLOOR. | Peltier, Daniel | New | |||
| Consultant | 17575 | 003778 | UWMC-EE-Wing | VARIOUS | FOR THE MONTH OF OCT 2009 - PROVIDE PERIODIC AIR MONITORING AND LEAD AND ASBESTOS SAMPLING UP TO 20 BULK SAMPLES IN SUPPORT OF THE UWMC EXPANSION PROJECT. TURNAROUND TIMES WILL VARY, BUT ASSUME 24-HOUR FOR ESTIMATING PURPOSES. CP#201385 Contacts include: |
Polk, Molly | New | |||
| Consultant | 17527 | 003778 | UWMC-EE-Wing | VARIOUS | FOR THE MONTH OF SEPT 2009 - PROVIDE PERIODIC AIR MONITORING AND LEAD AND ASBESTOS SAMPLING UP TO 20 BULK SAMPLES IN SUPPORT OF THE UWMC EXPANSION PROJECT. TURNAROUND TIMES WILL VARY, BUT ASSUME 24-HOUR FOR ESTIMATING PURPOSES. CP#201385 Contacts include |
Polk, Molly | 9/8/2009 | Work In Progress | ||
| Consultant | 17289 | 003778 | UWMC-EE-Wing | VARIOUS | Scope of Work: For the month of June 2009 - Provide periodic air monitoring and lead and asbestos sampling up to 20 bulk samples in support of the UWMC Expansion Project. Turnaround times will vary, but assume 24-hour for estimating purposes. Contact |
Polk, Molly | 6/8/2009 | Work In Progress | ||
| Estimate | 16407 | 174908 | WDS BLDG FOR EARLY CHILD ORAL HEALTH -Sandpoint 25 | throughout | Scope of Work: Removal of remaining ACM pipe insulation in main/visible areas of building. Open/exposed pipe insulation only. Removal of entire pipe (wrap and cut) OK. No wall or ceiling demo included. Coordinate with Molly Polk and Rick Pierce for p |
Polk, Molly | 6/24/2008 | Estimate In Progress | ||
| Abatement | 17586 | 003423 | HSB-G-Wing | ENTIRE BLDG | ASBESTOS LABELING HSB G WING | Rastegar, Saeid | 10/21/2009 | 5 | Day | Scheduled |
| Abatement | 17585 | 003423 | HSB-D-Wing | ENTIRE BLDG | ASBESTOS LABELING HSB D WING | Rastegar, Saeid | 10/14/2009 | 5 | Day | Scheduled |
| Abatement | 17584 | 003423 | HSB-J-Wing | ENTIRE BLDG | ASBESTOS LABELING HSB J-WING | Rastegar, Saeid | 10/28/2009 | 5 | Day | Scheduled |
| Abatement | 17583 | 003423 | HSB-F-Wing | ENTIRE BLDG | ASBESTOS LABELING HSB F-WING | Rastegar, Saeid | 10/7/2009 | 5 | Day | Scheduled |
| Abatement | 17582 | 003423 | Gerberding Hall | ENTIRE BLDG | ASBESTOS LABELING FOR GERBERDING HALL | Rastegar, Saeid | 10/1/2009 | 4 | Day | Scheduled |
| Abatement | 17581 | 003423 | Meany Hall | ENTIRE BLDG | ASBESTOS LABELING MEANY HALL | Rastegar, Saeid | 9/28/2009 | 3 | Day | Scheduled |
| Abatement | 17567 | 003423 | Kane Hall | Entire Buidling | ASBESTOS LABELING FOR KANE HALL | Rastegar, Saeid | 9/22/2009 | 4 | Day | Scheduled |
| Estimate | 17081 | 123456 | Plant Svcs Bldg | Estimate to write a new abatement contract. | Rastegar, Saeid | New | ||||
| Abatement | 17607 | 017180 | Communications | 151 | CLEAN UP ASBESTOS DEBRIS AND VACUUM | Riley, Tom | New | |||
| Abatement | 17604 | 014760 | 3935 Univ Way NE | 008C | PLEASE ABATE PUTTY ON THE WINDOW. THANKS, DAN |
Riley, Tom | 10/2/2009 | 1 | Day | Scheduled |
| Abatement | 17574 | 017180 | Communications | 151 | WINDOW GLASS BROKEN PLEASE ABATE WINDOW IN ROOM151. THANKS, DAN | Riley, Tom | 9/24/2009 | 1 | Day | Scheduled |
| Consultant | 17593 | 008772 | Engr Library | ROOF AND GUTTERS | PLEASE TEST DEBRIS ON ROOF AND GUTTERS. FOR USE OF JLG, CONTACT TOM AT 221-6021. | Riley, Tom | 10/2/2009 | Work In Progress | ||
| Consultant | 17591 | 009206 | Mercer Hall | ROOF GUTTERS | PLEASE TEST DEBRIS IN GUTTERS. FOR USE OF JLG CONTACT TOM AT 221-6021. | Riley, Tom | 10/2/2009 | Work In Progress | ||
| Estimate | 13813 | 992318 | HSB-F-Wing | F-356B | 10/14/05 NEED HAZMAT ESTIMATE TO REMOVE ALL COVE BASE MOLDING IN F-356B (WER) | Ringwald, Will | 10/17/2005 | Estimate In Progress | ||
| Abatement | 17611 | 018781 | Balmer Hall | 214 | REPAIR DAMAGE TO CEILING - FALLING DEBRIS | Riojas, Luis | New | |||
| Abatement | 17588 | 016308 | Stadium | ceiling & east wall of press box score board | ADDITIONAL REMOVAL OF SHEET ROCK | Riojas, Luis | 9/22/2009 | 1 | Day | Scheduled |
| Abatement | 14903 | 061553 | Hillcrest | BASEMENT | ABATE ASBESTOS INSULATION ON WATER PIPES. NEED TO INSTALL NEW RADIATOR IN KITCHEN. WATER LINES ARE IN BASEMENT. JEFF HNILO WILL MARK THE LINES. |
Riojas, Luis | On Hold | |||
| Consultant | 17614 | 018951 | Thomson Hall | 214 | CHECK RADIATOR FOR LEAD PAINT AS REQUESTED BY SUSAN A COLLIGAN TAKE SAMPLE | Riojas, Luis | 10/2/2009 | Work In Progress | ||
| Consultant | 16780 | 203707 | Gowen Hall | RM 45 | MOISTURE READING AND MOLD ASSESSMENT | Riojas, Luis | 11/14/2008 | Work In Progress | ||
| Abatement | 17572 | 017202 | Terry Hall | ESPRESSO BAR/KIOSK AT 2 CON | ABATE COFFEE COUNTER FACE WHICH SAEID HAS SEEN. | Ritter, Jim | 9/23/2009 | 1 | Night | Scheduled |
| Consultant | 17268 | 162180 | Schmitz Hall | roof access door | The roof access door on the W. side is falling apart. Phase in 34LOCK to secure door Phase in 32HAZM to test jamb for ACM. Jamb is rusted out and white filler materiall lis exposed and crumbling |
Ritter, Jim | 5/18/2009 | Work In Progress | ||
| Consultant | 16789 | 201667 | Haggett Hall | N500B | 11/18/08 Phase in 32HAZM to test door and jamb for ACM. Contact Jim Ritter or Octo Nava with any questions. |
Ritter, Jim | 11/25/2008 | Work In Progress | ||
| Consultant | 16719 | 196563 | Terry Hall | HAGGETT DOOR STORRAGE | 10/16/08 Phase in 32Hazmat to test door in Haggett door storage. Need immediate turn-around See Jim Ritter for details (cell phone 391-7223). |
Ritter, Jim | 10/17/2008 | Work In Progress | ||
| Consultant | 16709 | 150639 | Lander Hall | L131 | 10/13/08 Phase in 32HAZM to test material inside metal jambs see JRitter or Octo Nava for details. |
Ritter, Jim | 10/16/2008 | Work In Progress | ||
| Consultant | 16707 | 198069 | Terry Hall | 2ND FL KITCHENN | 10/13/08 Phase in 32HAZM to test material inside metal jamb for ACM. See JRitter or ONava for details. |
Ritter, Jim | 10/16/2008 | Work In Progress | ||
| Consultant | 16633 | 192230 | McCarty Hall | G003 | 9/9/08 Inspected ONava at end of shift. Door is split and leaking white powder. Taped and covered with plastic to contain. Door cannot be unlocked - kicked in or forced must phase in 32HAZMAT & 34LOCK 9/10/08 Phase in 32HAZMAT to test For ASM and pos |
Ritter, Jim | 9/10/2008 | Work In Progress | ||
| Consultant | 16625 | 192186 | Terry Hall | T-25 | 9/8/08 Phase in 32HAZMAT to test plaster/paint for ACM and lead. Contact Lance Hendrix (using Bob Morgans cell/nextel)for details and location. |
Ritter, Jim | 9/9/2008 | Work In Progress | ||
| Consultant | 16611 | 189395 | McCarty Hall | STAIR#3, F1, ST | URGENT, A FIRE DOOR ON 1ST FLOOR , STAIR #3 SOUTH TOWER WAS CRACKED AT THE DOOR KNOB, THERE IS A WHITE POWDER EXPOSED, IF IT IS ASBESTOS, PLEASE CHECK IT. |
Ritter, Jim | 8/28/2008 | Work In Progress | ||
| Consultant | 17610 | 013267 | HSB-RR-Wing | RR-235 | 0-10-01-09***TEST COVE BASE ADHESIVE IN RR-235. JHR | Ritzenthaler, John | 10/2/2009 | Work In Progress | ||
| Estimate | 17056 | 221570 | HSB-BB-Wing | BB1024 | Saeid said $300 for abatement and consultant for hole in stainless steel top for eyewash installation. Jhr |
Ritzenthaler, John | 3/3/2009 | Estimate In Progress | ||
| Estimate | 16237 | 162574 | HSB-BB-Wing | BB1456 | 03-31-08***Estimate to clean ceiling area for removal of stainless hood, gas, and air piping. Room is unoccupied at present. JHR |
Ritzenthaler, John | 4/1/2008 | Estimate In Progress | ||
| Estimate | 15971 | 133146 | HSB-T-Wing | T273 | 12-10-07***Estimate only for cleaning ceiling tiles. jhr | Ritzenthaler, John | 12/11/2007 | Estimate In Progress | ||
| Estimate | 14130 | 010353 | HSB-RR-Wing | 337 - LAB AND PIPE CHASE | PLEASE PROVIDE ESTIMATE TO ABATE EXISTING LAGGING IN THE LAB AND PIPE CHASE. THANKS! 02-08-06 JHR | Ritzenthaler, John | 2/8/2006 | Estimate In Progress | ||
| Consultant | 17264 | 208277 | Winken For Sci Lab | see scope | 32Hazm: Test suspected asbestos gasket sealing ducting flanges. Call Jerrett 685-8808 for location. Thx. |
Roberge, Jerret | 5/15/2009 | Work In Progress | ||
| Abatement | 17564 | 006454 | Guthrie Annex 4 | see scope | THE PLASTER IN GUTHRIE ANNEX 2 HAS A HIGH ASBESTOS CONTENT. WE ARE REQUESTING ONE (1) HOLE FOR A MOUNTING SCREW ON THE 1st FLR AND 3 HOLES FOR MOUNTING SCREWS ON THE 2nd FLR IN RM 205. | Salmon, Keith | 9/28/2009 | 1 | Night | Scheduled |
| Consultant | 17569 | 009802 | Stadium | see scope | PLEASE TEST THIS PAINT FOR LEAD CONTENT. OUTDOOR STEEL SUPERSTRUCTURE UNDER THE DON JAMES CENTER ABOVE THE PARKING AREA ON THE NORTH SIDE OF THE STADIUM. | Salmon, Keith | 9/24/2009 | Work In Progress | ||
| Estimate | 17089 | 222057 | HSB-T-Wing | T439 | ABATE CEILING TILES ALONG WEST WALL AND ALONG ENTIRE SOUTH WALL TO A/V BOOTH. ABATE APPROXIMATELY 20' OF CEILING TILES FROM SOUTH WALL IN A NORTHERLY DIRECTION IN CENTER FOR INSTALLMENT OF CAMERA/PROJECTOR. PLEASE CONTACT MATT SCILLO FOR A WALK THROUGH.-- | Scillo, Matt | 3/17/2009 | Estimate In Progress | ||
| Consultant | 17269 | 237350 | Edmundson Pavilion - underground | EXTERIOR WINDOW | ASBESTOS INSPECTION HEC ED THE SOUND TRANSIT PROJECT AT HUSKY STADIUM NEEDS TO REMOVE A WINDOW IN HEC ED AND WE NEED TO VERIFY IF IT CONTAINS ANY ASBESTOS. THE WINDOW IS LOCATED ON SOUTH WEST CORNER END OF HEC ED. IT IS THE MOST SOUTHWEST LOWER WIND |
SIGMAN, WILL | 5/18/2009 | Work In Progress | ||
| Estimate | 14513 | 045661 | UW (Tacomo) Cherry Parks | UW TACOMA LONGSHORMANS HALL | ESTIMATE TO ABATE THE INSULATION ON THE BOILER AND THE PIPES IN THE BOILER ROOM. ALSO INCLUDED IS THE INSULATION ON THE INSIDE OF THE FIRE BOX ACCESS PANEL. LOCATION: UW TACOMA LONG SHOREMAN HALL BOILER ROOM. ALSO NEED ESTIMATE TO REMOVE BURNER AND A |
Smith, Hugh | 7/17/2006 | Estimate In Progress | ||
| Estimate | 15777 | 123456 | Mech Engr Bldg | Estimate to remove the exterior caulking around the window (and does not include window putty) | Sonderland, David | New | ||||
| Abatement | 16807 | 205338 | Plant Svcs Bldg | machine shop | REMOVE ASBESTOS PACKING FROM WORK AREA LOCATED IN MACHINE SHOP CONTACT JASON EDWARDS NEX# 76 |
Steele, Tom | New | |||
| Estimate | 13530 | 978393 | Haggett Hall | N.T. MECH ROOM | PLEASE ABATE 2 FT (APP.)FROM EACH SIDE OF PUMP AND FLANGE GASKETS. WE WILL LOOSEN THE FLANGE BOLTS. THE PUMP SHOULD BE READY TO ABATE ON MONDAY 8/1/05 TWS3 7/28/05 | Steele, Tom | 8/1/2005 | Estimate In Progress | ||
| Abatement | 17560 | 016435 | HSB-BB-Wing | BB1000L (Corridor outside comm Closet BB-1000C | SCOPE OF WORK: CLEAN APROX 84 SF OF CEILING TILE. I WILL SEND DRAWING WITH AREA OF SCOPE MARKED TO DEBRA AS AN ATTACHMENT. ROOM/LOCATION: BB1000L (CORRIDOR OUTSIDE COMMUNICATION CLOSET BB1000C) ESTIMATED QUANTITY OF SQUARE FOOTAGE: 84 OTHER CONTA | Templin, John | 9/22/2009 | 1 | Night | Scheduled |
| Consultant | 15206 | 096865 | Stadium | Lower Stands North East Section | Scope of Work: The Concrete stairs have collaped and we are going to use the Job Order Contractor Form and pour new stairs. The JOC contractor is being used because of man power issues with Alterations services. We need a survey in order to write th |
Templin, John | 4/4/2007 | Work In Progress | ||
| Estimate | 14786 | 201243 | Hall Health Ctr | Roof off 4th Flr & 309, 311, 315, 317, 319 | Scope of Work: Provide Estimate for Monintoring and abatement for cutting in for roof equipment rack and spot abatement of floor tile and mastic at 5 locations. This is for an estimate for work identified on report and spec section provided under Clayto |
Templin, John | 10/25/2006 | Estimate In Progress | ||
| Estimate | 14162 | 201183 | Henderson Hall | 306, 308, 312, 312A | Scope of Work: Provide estimate for abatement of materials required for construction. This estimate to be based on the request for consultant testing submitted for this work on 2/17/06. (THE CONSULTANT WOR ORDER IS 14163) |
Templin, John | 3/6/2006 | Estimate In Progress | ||
| Abatement | 17531 | 011089 | Harborview East Hospital | BEH Cooridor A | REMOVE OF ASBESTOS CONTAINING MASTIC WHICH HAS A OVERLAY OF VCT. ROOM/LOCATION: BEH COORIDOR A. 300 Sq feet shutdown required I would like to tentatively schedule the work for Friday. October 2nd starting at 6:30AM. | Thiele, Dave | 10/1/2009 | 1 | Day | Scheduled |
| Consultant | 16649 | 171613 | Hitchcock Hall | 307, 303 | Good faith testing 303, 307. Scope; Patch, paint wall orange walls in 303. Remove and replace (3)bench tops in 307 (center bench with sink, (1) perpindicular to northwest window wall and (1) perpindicular to northeast window wall). Disconnect/reconnec |
Thompson, Donna | 9/19/2008 | Work In Progress | ||
| Consultant | 16573 | 172298 | HSB-F-Wing | see scope | Please provide a good faith survey on a 2 day turn around for F146, 150, 155, 158 suite. Scope of work; remove/replace shelving, ceiling tiles, diffusers, patch and paint walls, grid and floors where already painted 146, 150, 155, 158. Remove and re | Thompson, Donna | 8/13/2008 | Work In Progress | ||
| Consultant | 16558 | 178423 | HSB-F-Wing | F342 | Please proceed with good faith survey oin this room. Scope of work; Remove and replace miniblind, carpet and base, shelving, ceiling tiles, diffusers. Patch and paint. Cut new relite in existing wood door. Can I get a 2 day turn around? |
Thompson, Donna | 8/8/2008 | Work In Progress | ||
| Consultant | 16554 | 177440 | HSB-H-Wing | H364C | Good faith survey H364C,D Scope of work involves wall demo, re-configuration of light fixtrues and switching, carpet and base demo. PLease make this a 2 day turn around. |
Thompson, Donna | 8/6/2008 | Work In Progress | ||
| Estimate | 15562 | 103462 | HSB-T-Wing | T277 | ABATEMENT OF AREA IN CEILING PLENUM FOR PROJECTOR ATTACHMENT TO STRUCTURE ABOVE. |
Thompson, Donna | 7/25/2007 | Estimate In Progress | ||
| Estimate | 13652 | 121212 | HSB-RR-Wing | T-747 | estimate for cleaning T-747 (estimate one is for weekends) | Thompson, Donna | 8/29/2005 | Estimate In Progress | ||
| Estimate | 13651 | 121212 | HSB-T-Wing | T-747 | estimate for cleaning T-747 (estimate one is for weekdays) | Thompson, Donna | 8/26/2005 | Estimate In Progress | ||
| Estimate | 13499 | 922998 | Guthrie Annex 2 | see scope | PLEASE PROVIDE AN ESTIMATE TO ABATE THE FOLLOWING; ROOM 109 - 26 SF OF GLUED ON CEILING TILE/MASTIC, 11 LF OF COVE BASE, APPROX 10 SF OF VINYL TILE. THE BASE AND TILE ARE IN THE CORRIDOR AND IN THE ROOM ITSELF. ROOM 111 - 98 SF OF CARPET. REMOVE BROK |
Thompson, Donna | 7/22/2005 | Estimate In Progress | ||
| Consultant | 17266 | 206215 | HSB-H-Wing | H073 | Survey lab counter/undercounter sink area where new DI plumbing valve will be installed. See Leslie for scope of work. (206) 849-7352 |
Toussaint, Leslie | 5/15/2009 | Work In Progress | ||
| Consultant | 17262 | 202008 | HSB-F-Wing | F047 | Survey Room F047: Joint compound and paint on west, north and east walls where new fume hood will be installed. Survey above ceiling area and and pipe joints. See Leslie for scope drawings and walk through. (206) 849-7352 |
Toussaint, Leslie | 5/18/2009 | Work In Progress | ||
| Estimate | 14115 | 995217 | HSB-H-Wing | F-643 | 2/1/06 ESTIMATE FOR CLEAN UP OF PIPE INSULATION FALLEN ON CEILING TILES. *****THIS IS FOR THE F-WING NOT H-WING AS INDICATED IN THE BUILDING NAME********** | Toussaint, Leslie | 2/2/2006 | Estimate In Progress | ||
| Estimate | 13648 | 966281 | Art Building | coffe shop | PLEASE PROVIDE ESTIMATE TO SURVEY AREA FOR HAZMAT. PROPOSED WORK INCLUDES REMOVAL OF EXISTING COUNTER, BASE CABINETS AND SINK, CUTTING INTO CONCRETE FLOORS AND REFINISHING CMU WALL BEHIND SINK. |
Toussaint, Leslie | 8/29/2005 | Estimate In Progress | ||
| Abatement | 17576 | 017402 | Burke Museum | see scope | PLEASE CONTACT CHERYL DIAMOND FOR MORE INFORMATION IF NEEDED @ 206-396-1994. SCOPE OF WORK IS TO REMOVE OLD INCANDESCNET FIXTURE AND INSTALL NEW ONES. CHERYL WILL DISCONNECT POWER TO LIGHTS AND PROVIDE TEMPORARY LIGHTING. WE BELEIVE THAT ONLY THE FIXTUR |
Turner, Jim | 9/30/2009 | 1 | Day | Scheduled |
| Abatement | 17595 | 011254 | Plant Ops Anx 4 | interior wall 106A | ABATE ADDITIONAL AREA OF INTERIOR WALL AND A LARGE VENT IN ROOM 106A. | Wallace, Kirby | 10/1/2009 | 1 | Day | Scheduled |
| Abatement | 17570 | 000897 | HSB-I-Wing | see scope | ASSIST WITH ABATEMENT OF AUTOCLAVE | Ward, Katharine | 10/9/2009 | 1 | Day | Scheduled |
| Abatement | 17563 | 000921 | HSB-AA-Wing | see scop | ABATEMENT OF ROOM SURFACES AND FIXTURES AS DETERMINED BY HAZ REPORT....KCW | Ward, Katharine | 10/14/2009 | 2 | Day | Scheduled |
| Consultant | 17471 | 009573 | HSB-T-Wing | T-558 | NEED HAZ TEST FOR TIS ROOM... WORK WILL INVOLVE PATCH PAINT FOR THE WALLS,,,, SEE KATH FOR DETAILS...KCW | Ward, Katharine | 8/14/2009 | Work In Progress | ||
| Consultant | 17259 | 216307 | McMahon Hall | suites 1150,1051,858,570 550 | need HAZ surveys for bathroon suites 1150,1051,858,570 550.... | Ward, Katharine | 5/18/2009 | Work In Progress | ||
| Consultant | 17059 | 199748 | HSB-BB-Wing | BB544 | lead worker monitoring for paint shop...kcw FRIDAY MORNING AT 7:00 AS PER EMAIL FROM CARL WOODS. | Ward, Katharine | 3/20/2009 | Work In Progress | ||
| Consultant | 16924 | 199501 | HSB-T-Wing | T545 | need haz survey for project...see katharine for details,,,,kcw | Ward, Katharine | New | |||
| Consultant | 16770 | 186699 | HSB-D-Wing | D303 | need basic haz survey for wallboard...kcw | Ward, Katharine | 11/10/2008 | Work In Progress | ||
| Consultant | 16769 | 195222 | HSB-T-Wing | T551 | need basic survey for wallboard haz,,, see katharine | Ward, Katharine | 11/10/2008 | Work In Progress | ||
| Consultant | 16768 | 198334 | HSB-E-Wing | E303 | need basic survey for wall board HAZ saee Katharine | Ward, Katharine | 11/10/2008 | Work In Progress | ||
| Consultant | 16702 | 183616 | HSB-C-Wing | C311 | need haz survey for entire suite area... contact kat for walkthru....kcw |
Ward, Katharine | 10/10/2008 | Work In Progress | ||
| Consultant | 16701 | 186698 | HSB-C-Wing | C315 includes the suite | need haz survey for entire suite/ contact kat for walkthru... | Ward, Katharine | 10/10/2008 | Work In Progress | ||
| Consultant | 16687 | 161635 | HSB-E-Wing | E060 & 063 | full room surveys for 060 & 063,,, pls see Kath for details....kcw 1 day turnaround pls |
Ward, Katharine | 10/7/2008 | Work In Progress | ||
| Consultant | 16564 | 152068 | HSB-T-Wing | T517 - T-521 SUITE | Please a good faith hazard survey estimate for entire T517 & 521 suite. Contact KW for more information. plus wall surfaces only 523 & 525 |
Ward, Katharine | 8/8/2008 | Work In Progress | ||
| Estimate | 14863 | 044871 | Parrington Hall | 303 & 303A | PLS PROVIDE ESTIMATE TO CUT 6X4 OPENING IN WALL BASED ON RECENT SURVEY RESULTS ; PLS SEE KATHARINE FOR WALK-THRU....KCW (5% LEAD IN THE PAINT) |
Ward, Katharine | 11/29/2006 | Estimate In Progress | ||
| Estimate | 14765 | 046340 | More Hall | 110 | PLS PROVIDE ESTIMATE FOR ABATMENT NEEDED FOR THE REMOVAL OF THE BOTTOM FOOT OF REMAINING DEMO'D WALL WHERE IT MEETS THE FLOOR TILE WE WILL TEAR DOWN THE WALL TO THAT POINT ;AFTERWARDS WE WILL BE INSTALLING NEW CARPET TILE & COVE BASE TO COVER THE NEW EXPA | Ward, Katharine | 10/12/2006 | Estimate In Progress | ||
| Estimate | 14276 | 019026 | McCarty Hall | 334,334B | PROVIDE ESTIMATE FOR ABATEMENT OF DESIGNATED AREAS IN ROOMS 334,334B, PLS SEE KATHARINE FOR DETAILS...KCW | Ward, Katharine | 4/10/2006 | Estimate In Progress | ||
| Abatement | 17565 | 016273 | Utilities | NE-3 | LOCATION: NE-3 NEED SUSPECTED ACM AND BLANKET REMOVED FROM VALVE. | Washington, Booker | 9/22/2009 | 1 | Day | Scheduled |
| Consultant | 17300 | 238764 | Ocean Teach Bldg | ROOM 25 BSMT LV | Need material checked for asbestos content, flagged. | Washington, Booker | 5/28/2009 | Work In Progress | ||
| Consultant | 16684 | 186468 | Utilities | see scope | Take a smple in about four places for possible ACM. Give me a call for the locations. Booker |
Washington, Booker | 10/6/2008 | Work In Progress | ||
| Consultant | 16608 | 182908 | HSB-BB-Wing | BB1123 | Check for Mold around floor base. Please test floor materials also | White, Rodney | 8/27/2008 | Work In Progress | ||
| Abatement | 17612 | 018909 | Harborview East Hospital | 4EH-19 | ABATE PIPING | Wilson, Ray | New | |||
| Estimate | 16877 | 210825 | Harborview East Hospital | HH TUNNEL | ESTIMATE FOR FLOOR ABATEMENT | Wilson, Ray | 12/29/2008 | Estimate In Progress | ||
| Consultant | 16606 | 168186 | HSB-T-Wing | T627 | I am opening a phase for the hazmat crew to test the adhesive glue for asbestos, which held a fabric board against the wall behind the pullout beds. We were suppose to start this job Monday, but to my surprise the client had torn these boards off the |
Woods, Carl | 8/27/2008 | Work In Progress | ||
| Estimate | 15195 | 086243 | CHDD Clinic | 252 & 252A | PLEASE PROVIDE A ESTIMATE TO DEMO WALL BETWEEN CHDD 252 AND 252A. I WOULD LIKE TO DO A WALK THRU WITH SAEID Carl Woods Temporary Project Manager Office 685-1494 Cell 265-0480 | Woods, Carl | 4/2/2007 | Estimate In Progress |