WAC 478–355–030: Project construction cost.


Whenever the estimated project construction cost of any University of Washington public work is less than two hundred thousand dollars, the University of Washington senior vice-president for finance and facilities is authorized to use the small works roster in lieu of public advertisement for bids. In the event the legislature further increases the small works roster limit, the university is authorized to use the small works roster for any projects up to the subsequently authorized limit.

[Statutory Authority: RCW 28B.20.130 and BRG, Standing Orders, Chapter 1. 12-03-038, § 478-355-030, filed 1/9/12, effective 2/9/12. Statutory Authority: RCW 39.04.155. 01-08-007, § 478-355-030, filed 3/22/01, effective 4/22/01. Statutory Authority: RCW 28B.10.355. 93-24-049, § 478-355-030, filed 11/24/93, effective 12/25/93. Statutory Authority: RCW 28B.20.130. 88-19-041 (Order 88-01), § 478-355-030, filed 9/14/88. Statutory Authority: RCW 28B.20.130 and 39.34.080. 86-08-027 (Order 86-1), § 478-355-030, filed 3/26/86.]