When
the original IMA was constructed in 1968, the University had total
enrollment of 27,000. The facility was designed to accommodate the
needs of this campus population. By 1999, enrollment exceeded 35,000
and the building, while still in good condition, was being pushed
to its limits. In addition, the recreational demands of students
have changed since the 1960s.
A campus survey was conducted
and the Student Activities Committee, in conjunction with the Office
of Student Affairs, recommended that a major building renovation
and addition be constructed with funds raised from issuing bonds
to be repaid with a new student activity fee.
The bonds were issued in late
2000 and the facility began construction in August 2001. When completed
in spring 2003, the newly redone IMA will boast an indoor climbing
rock, running track, two new basketball courts, and increased space
for weight and fitness training. An expanded front entrance and
café will add to the appeal of the building. In addition,
a night lighting system will be added to an outdoor sports field
and, funds permitting, renovations will be made to the golf driving
range.
This new state-of-the-art facility
will serve UW students, faculty, and staff well into the new century.
|