Search | Directories | Reference Tools
UW Home > UWIN > Admin Gateway 

Completed Work Plans for Lead Containing Materials


MS Word Format


1.  "Template"
2.  "Scrape loose paint from wood to prepare surface for painting"
3.  "Rotohammering"
4.  "Remove and cut exterior woodsiding containing lead based paint"

5.  "Remove loose paint by pressure washing to prepare surface for painting"
6.  "Drilling holes in sheetrock and wood"
7.  " Remove lead based paint using troweled on chemical stripper"

 


Last Updated January 14, 2004

<<< Back to the Asbestos Operations Home Page