Departmental Relocations
| |
(Approved by the President by authority of Executive
Order No. 1; the Provost by authority of Executive
Order No. 4; the Executive Vice President by
authority of Executive Order No. 5; and the Vice
Provost and Vice President for Computing and
Communications by authority of Executive Order No. 63) |
1. Scope
These guidelines have been developed to make moving
as convenient and trouble-free as possible. These guidelines do
not apply to major construction or renovation projects administered
by the Capital Projects Office; in those instances, a project
manager is assigned to coordinate the moves and departments should
consult the project manager for information and advice.
2. Coordination of Departmental Moves
a. Funding the Departmental Move
The primary responsibility for coordination of
departmentally initiated moves rests with the individual departments.
Most costs connected with moving and installation of equipment
will be charged to the departmental budget. Services provided
by the Capital and Space Planning Office, the Equipment Inventory
Office, and the Capital Projects Office's Design Services
are described in this policy statement.
It is the responsibility of the individual departments
and/or colleges and schools to provide sufficient funds for
whatever repairs and remodeling are necessary. Under some
circumstances, funds for remodeling projects costing more
than $2,500 may be available from unallocated reserves in
the Minor Repairs portion of the central administration's
capital budget.
Requests and justifications for central administration
funding must be sent to the Capital and Space Planning Office,
Box 351263, 2066167442, with the endorsement
of the dean's or vice president's office. When the budget
has been established and work details approved by the department,
Design Services will coordinate the construction schedule
with the appropriate Physical Plant shops.
b. Appointing a Coordinator for the Departmental
Move
Once a department has received official notification
from the central administration on the space assigned to the
department, the department should appoint one person as the
moving coordinator. This person will complete the following
activities:
| 1) |
|
NotificationNotify
all employees of the move, the tentative time
schedule, and tentative room assignments.
|
| 2) |
|
Floor
PlansObtain floor plans from the Facilities
Services Records Vault, 2062214380,
and, if necessary, arrange to tour the new office
space. (Departments moving into space occupied
by other units are encouraged to use discretion
when contacting the present occupants.)
|
| 3) |
|
Cost
EstimatesRequest cost estimates from
the Capital Projects Office, Box 352215,
2065438200, if minor repairs or remodeling
are desired in the new office space. The department
should request information and costs for structural,
electrical, ventilation, and any other adjustments
necessary to accommodate special space requirements
for equipment, libraries, workrooms, computers,
etc.
|
| 4) |
|
Additional
Equipment and FurnitureArrange to obtain
needed equipment and furniture through the Purchasing
Department, Box 351110, 2065435810,
or the Surplus Property Office, Box 355210,
2066851573. Contact Capital Projects
Office's Design Services, Interior Design, Box 352215,
2065435200, for assistance in choosing
new furniture, carpeting, and similar items as
necessary.
|
| 5) |
|
Advance Notice
of MoveEnsure sufficient lead time for
notification of campus departments in order to
minimize disruption and increase efficiency in
campus moves. The lead time may vary with the
location and magnitude of the move. For example,
the Property and Transport Services Office requires
only two weeks advance notice whereas the installation
and planning of communications equipment may require
six weeks to six months. Additional activities
that need to be coordinated prior to the move
are room assignments, the location of equipment
and supplies, and address and box number adjustments.
This includes notifying offices such as Payroll
and Purchasing of the new box number. This will
ensure that important, time-critical reports are
not misdirected during the move.
|
| 6) |
|
Moving Inventorial EquipmentObtain
a listing of inventorial equipment from the
Equipment Inventory Office, Box 355915,
2065434663. Develop and disseminate
packing procedures. Use the Property Activity
Request form as follows:
-
Summarize the equipment to be moved
(for example, 12 computer workstations,
3 printers, etc.) and complete
a Property Activity Request form for
this equipment.
-
Use a separate Property Activity Request
form to specifically identify material
and equipment to be disposed of through
the Surplus Property Office, Box 355210,
2066851573.
-
Use another Property Activity Request
form to indicate any department transfers
that occur as a result of the move.
-
Send copies of the Property Activity
Request form (as noted on the form)
to the Equipment Inventory Office,
Box 355915, the Surplus Property
Office, Box 355210, and the Property
and Transport Services Office, Box 355210,
as appropriate. Note: The department
should enter location and custodial
changes directly on the Online Asset
Information System (OASIS) if the
equipment item(s) being moved are
within the department's level of online
security. If these changes have already
occurred in OASIS and the item(s)
are not being surplused, the Property
Activity Request forms need not
be sent to the Equipment Inventory
Office, unless the accountable University
department's organization code(s)
require changing.
The Equipment Inventory Office will automatically
change building locations for all equipment moved
and delete equipment listed as sent to the Surplus
Property Office. The department should complete
a physical inventory as soon as possible following
the move. Equipment room locations will be updated
according to this inventory. Several months' lead
time is also necessary for disposal of federally
owned equipment. Coordinate this action through
the Equipment Inventory Office's Federal Program
Coordinator.
|
| 7) |
|
Security
MattersConsider security matters connected
with the move. Advance arrangements should be
made to relocate security alarm systems to the
new site. If a security system is being considered
for the new site the Crime Prevention Unit of
the University Police is available to advise and
recommend a security system that meets the particular
needs of the department. Staff should be present
at both locations during the actual move; if this
is not feasible, the unattended offices should
be securely locked.
|
| 8) |
|
Environmental
Health and Safety MattersConsider environmental
health and safety matters pertaining to the move,
such as transporting hazardous materials and the
location of equipment within the office or laboratory
setting. Contact the Environmental Health and
Safety Department, 2065437262, for
a list of Environmental Health and Safety Considerations
relating to moving into new facilities.
|
| 9) |
|
Computing & Communications (C&C) ConcernsContact
Network Installations, Box 354150, 2065435068,
or via email at install@cac.washington.edu,
for ethernet or other computer cabling relocations.
Contact Communication Technologies, Box 354150,
2065430133, or via email at telecom@cac.washington.edu,
for telephone or other communication service
relocations.
In the event of telephone or other communication
service relocations, normal installation charges
apply. Installation charges are generally
dependent on the type and extent of the service(s)
involved, and on the nature of the future
facilities.
Current C&C policy states that once an ethernet
connection is installed it may be used at
the installed location without recurring charge.
No charges will apply for departments that
move to a location already wired for ethernet
when no additional connections are required.
If facilities are required at the new location,
and/or remodeling requires moving an existing
connection, normal installation charges will
apply.
|
3. Coordination of Central AdministrationRequested
Moves
Occasionally, the Provost may request that a department
exchange some of its existing space for comparable space. When
the department and the central administration have mutually agreed
to such a move, the responsibility for coordinating the move rests
with both the department and the Capital and Space Planning Office.
The Capital and Space Planning Office will assist
the department in obtaining cost estimates for any remodeling
that has been agreed upon prior to the reassignment of space by
the Provost, including such items as new office signs, telephones,
and minor repairs or remodeling.
As with the departmentally initiated moves discussed
in Section 2, the Capital Projects Office's Design Services
will supply the department, via the Capital and Space Planning
Office, with cost estimates for any remodeling and will coordinate
the actual construction. Following the completion of the repairs,
or if no remodeling is required, the department will coordinate
the moving schedule with the Property and Transport Services Office.
While the usual moving expenses associated with the move will
be paid for by the central administration after review and approval
by the Capital and Space Planning Office, the individual department
is still responsible for internal office coordination, including:
-
Coordinating the new office assignments.
-
Completing the Property Activity Request form.
-
Packing office contents into moving boxes and marking
individual pieces of equipment with the room number
where it is to be delivered, etc.
-
Notifying various campus services: the Parking Services
Office to arrange for new parking assignments; building
coordinators to update building directories; and the
Mailing Services Office to be assigned new address(es)
and box number(s).
|